We have recently completed an environmental baseline survey for ASM Metal Recycling Ltd on a site in Iver, assisting in their application for a site licence under the Environmental Permitting Regulations (England and Wales), 2010. The works were
designed to assist with the completion of a Site Condition Report for submission to the Environment Agency.
As part of our assessment we used our Geoprobe drilling system to construct 50mm diameter boreholes and install permanent groundwater monitoring infrastructure at the site. Site works were completed in a single day. Soil and groundwater samples we collected were then analysed by our in-house UKAS accredited laboratory.
We would always recommend that anyone taking on the leasehold of a site consider completing an environmental baseline survey before taking possession or commencing activities. Identifying and quantifying historical contamination before occupation is the only
sure way to protect against future claims by the landlord for historical contamination liability.
Please contact James Skinner for advice regarding any aspect of managing potential environmental liabilities during a property leasehold.