We certainly get to work at a wide variety of different sites, but a call from a major banana distributor was a first even for us. The underground pipework carrying fuel to supply their trucks had failed and required urgent replacement. At short notice we were on site replacing the corroded steel pipework with modern plastic equivalents. We sampled the soil around the failed pipework and our in-house laboratory was able to confirm within 24 hours that no significant ground contamination had occurred. Within 36 hours the fuel supply system was back in commission and the banana trucks had started rolling again.