We were commissioned to carry out a geotechnical investigation, including rock coring, at a site located just a stone’s throw from the busy harbour of Dover.
Our Commachio 205 and drilling crew were able to produce high quality cores and gain SPT/CPT data from 4 boreholes, each drilled to a depth of 20m below ground level. All completed on time and on budget.
Voids were encountered at various depths fueling rumours of secret smuggling tunnels similar to those we found in Margate last year. Unfortunately the only treasure recovered were metres and metres of chalk. Better luck next time lads!
OK so not exactly Peru, but a very steep, terraced site in the Chilterns.
The extremely tight access didn’t prevent our site team from getting in and completing a comprehensive geotechnical investigation, including soil sampling and dynamic probing to 10m depth. The work was completed on time and on budget, with dynamic probing data issued to the client on a ‘same day’ basis to assist with pile design.
We have recently completed an incident response investigation of a domestic heating oil installation located at the centre of a residential accommodation block complex in southern England. The site overlies chalk and is located just 100m from a public drinking water supply borehole.
Following complaints of possible oil contamination issues from the residents we took samples of the underlying soils and audited the fuel installation. With only footpaths leading to the tank installation we used our Terrier drilling system – which can fit through a standard doorway – to install boreholes either side of the oil tank and take soil samples for rapid analysis in our UKAS laboratory. Fortunately no significant soil contamination had occurred and our recommended improvements to the installation are now underway. The entire project, from initial enquiry instruction to report issue, was completed in under 4 days.
We do like a challenge, so when a client asked if we could probe 65 pile locations in a single day we said yes. Just to make it more of a challenge our client also wanted soil samples taken from each location and analysed for a range of potential contaminants.
The site was an office car park crammed with cars during the week, so the probing had to take place at the weekend. With noise restrictions preventing Sunday working and project deadlines meaning the work had to be completed in a single day, we knew we would have our work cut out. Each location required us to core the surface pavement, take a soil sample from the upper metre of soil profile and probe to 3.6m depth – a total of 234m of probing. But happily, using our Geoprobe Direct Push drill rig we were able to get everything completed in time to see the kick-off of the FA Cup.
The soil samples were dropped off at our own laboratory later the same day for ‘fast track’ analysis and the results provided to the client 3 days later.
….to get your own water well. The BBC reports today that energy and water bills are set to rise for the next 17 years so it makes ever more economic sense to have your own private water well installed. Subadra offer a ‘turnkey’ solution, dealing with everything from the initial (free) hydrogeological appraisal, applications and permits to drilling the well, installing the pump and connecting to your existing water supply. If you would like to know more please contact Duncan Eastland.
Environmental planning conditions are commonplace in brownfield development and much of our work is involved in the negotiation of discharge of such conditions. We have developed excellent relationships with Planning Authorities and Environment Agency/Scottish Environment Protection Agency over the years and enjoy a good success rate in planning condition discharge.
Earlier in the year Subadra were commissioned to assist in a significant phased retail development on the south coast of England. The site is within Zone I of a Source Protection Zone, overlies Chalk and is 40m from surface water. In other words it is in an extremely environmentally sensitive location. Initial investigation works had identified diesel and waste oil in shallow groundwater under the site.
This is where owning our own drill rigs and our own laboratory comes into play! We were able to delineate and characterise the contamination, and install sentinel wells within a month and without delaying the build programme. As a result of our detailed assessment, we’ve negotiated a long-term remedial solution for the site, installed the required groundworks and construction works have commenced.
Subadra have been retained by a major food wholesaler/distributor to carry out a comprehensive audit/investigation of the fuel storage and supply infrastructure at a multi-site portfolio across the UK. Key to winning the contract was our ability to complete the project within a tight timescale. This is only possible because of our unique approach whereby every aspect of the project will be carried out using in house resources, from borehole drilling through to laboratory analysis; and, of course, our competitive rates!
Sometimes you need a detailed ground investigation with large numbers of boreholes, utilising a variety of different investigation tools (drill rigs, plate bearing tests, pile probing etc), with data collected and assimilated over a period of days or even weeks, that delivers a detailed description of site geology and provides a well defined contaminant delineation.We can do this for you.
However, sometimes you need a basic no frills contamination survey that is both cost effective and done on a very fast turnaround.Here at Subadra we own and operate our own survey team, drill rigs, chemical analysis laboratory in addition to our team of highly skilled geotechnical and environmental consultants that are responsible for collating, assessing and the reporting the data we produce. This means we can carry out high quality, cost effective Phase One and Two contamination surveys withindays.This service proves invaluable for may of out clients who are always on the lookout to purchase new sites to add to their portfolio and don’t want to lose out on a lucrative deal or, perhaps worse, get caught out by discovering contamination issues after the site has been purchased.
We recently carried out a survey at a filling station site in Hampshire that was instructed on a Friday at 4pm and we had carried out a below ground utilities survey, borehole investigation, groundwater monitoring and sampling, all analysis and data reported to the client by the following Thursday. Now how does that compare with the service you currently receive from your consultant?
When we discovered that Year 3/4 at St Mary’s CE Primary School in Amersham were learning about soils as their science topic this term we were pleased to put one of our drill rigs to a slightly more educational use. We offered to drill a shallow borehole in the playing field to demonstrate the soil profile below the school. We provided three soil cores in plastic liners for later inspection in class. Our drill team has never been cheered on by anyone before – perhaps there are a few budding engineering geologists in Amersham.